New studio

Started by garlo on 28 October 2008. 216 replies, 2008–2014. In the Library under Build diaries. Key posts in this thread.

Originally posted at johnlsayers.com, topic 11352.

Hai Carlo, Sorry you didn't get any response yet. An access panel is always good, consider it as a door: it still needs to be as heavy as your floor and well sealed using rubber. About the mackie, I'd add one cabinet for 19" devices to your room (underneath ye desk for example) and make it a heavy one, build for loud devices like the mackie. You also need to take care of heat coming from the devices. Good luck with the glass, 16mm is heavy! :)
Thanks Ro, yes 16mm laminated glasses were heavy. I continued with windows (you can t see sicagel but you can see charcoal inside ), plaster, preparing order for cables ... Some pictures.
271.jpg
271.jpg
272.jpg
272.jpg
274.jpg
274.jpg
277.jpg
277.jpg
More cables : Studio : 24p ( recycling from studio ) 2p rj45 midi . Voice stud : 8p 2p rj45 midi
280.jpg
280.jpg
Still working : painting, cables, tissu & access floor system
Image not preserved: 288.jpg
Image not preserved: 289.jpg
Preparing structure for the ceiling. Ceiling will be 4cm rock wool ( alreday in place ) + air 7cm & 8cm rockwool ( Rockfon Ekla evolution). Except 2 bass traps in the ceiling ( 8cm rockwool + 17cm air+8cmevolution ).
294.jpg
294.jpg
new ceiling in the cr & voice stud.
301.jpg
301.jpg
workin on the floor access system
303.jpg
303.jpg
I v been working for a year with extension electrical cord from my home, with exterior doors always open . And now I have electricity in the studio, Waouhh. Working on the floor in the cr.
Image not preserved: 311.jpg
308.jpg
308.jpg
Congrats on the power. :cry: I'm still running power from the house
Thanks Lily, & good luck to you, be patient, dream of the future when you can shut your door when it s raining, push a button & there s light .... heu not every buttons & plugs are working for now but it will ...
312.jpg
312.jpg
Every electric plugs & lights are working now. I need to buy nice & efficient lights now !
314.jpg
314.jpg
Electricity
316.jpg
316.jpg
Ah sunday. I did my 1st tests, with a small system . A Factotum Performance from Voice system, it s a compact amplification system with 2 sattelites & a subwwofer/amplifier/mixer ( I use it for rehearsing & small events). So this is not a hifi sound system. I put the satellites in the bass traps & subwoofer in front of the room. But it s good after all this work to seat & relax & listen to some music. I v listen to Urban Dance squad / Peter Gabriel / my last record Earth Link / Daft Punk & a flamenco guitar solo cd. Because of the system I couldn t judge the equalisation but : stereophony is incredible with a stable image even when you walk in the control room details and depth are very very good Lede control room works very well wood in the back give a good mood and ambience This is not a dead laboratory with a small sound completly absorbed walls angles don t send backsoundwaves there s life and warm mood balance between treble medium and low frequencies stay constant at low level and at 96dBa it was very cool ... and very few sound loss at the exterior of the building, I will makesound proofing tests when I can close all the doors ( need to finish painting doors, clean the floor, take all the tools out ... ) ...... Now I need to pack everythink at the existing studio before .... the Big removal day, so I have to wait a bit for real test with Ns10 and Alesis Monitor 2 & JM Reynaud systems.
314.jpg
314.jpg
320.jpg
320.jpg
I took the table from the studio, ( & cut front feet / the table is on the access floor system & on the floor ) so I can keep the patch & many wires. There will be less work to do.
321.jpg
321.jpg
Cables ready for the future rack
322.jpg
322.jpg
I ll begin in the studio ( 7m x 3m ) with just 2 walls of rockwool + 1 trap on the ceiling ( 1,5x1m ) & a triangle trap on the wall ( 2,5m x 70 ) . I will make the tests after the removal.
323.jpg
323.jpg
Image not preserved: 324.jpg
Patches are ready in the studio & in the voice studio
326.jpg
326.jpg
327.jpg
327.jpg
24xlr from studio & 8 xlr from the voice studio are ready behind the desk . There is also Midi & RJ45 & AES Ebu & video bnc in all rooms.
328.jpg
328.jpg
Rack 1 is ready in the soundbooth with 2 uninterruptive power suppliers. Rack will wait till the close of the existing rec studio downtown bordeaux for amplifiers. Rackable vintage effects & instruments will come here too.
335.jpg
335.jpg
Could not wait ... I took the amplifier & Monitor2 back & a SqnIVS to listen some music today. After 1tests ( with a small system ) I was a bit afraid of a lack of low frequencies but no Low frequencies are very present & very clean. as I said before, stereophony is very large with a stable image even when you walk in the CR details and depth are very good Lede control room works very well wood in the back give a good mood and ambience This is not a dead laboratory there s life and warm mood angles don t send backsoundwaves equalisation balance stay very stable at every levels at 101dBa it was very cool and outside it was raining ( can't hear low frequencies because of the rain). Tomorrow I will make some sound levels tests in the rooms.
337.jpg
337.jpg
My old desk d8b looks still alive, I removed it from existing studio & begun pluggin.
Image not preserved: 340.jpg
I removed the control room rack ( Dat / Tc Finalizer / Eq Weiss / Vu Oram / 2 Preamps Amek Neve / Rev Lexicon / Delay Tc / Tc effects / Aphex C ( havent try this one ! ) / cd & K7 ). Need to plug & test everything.
342.jpg
342.jpg
still pluggin rack / d8b monitor is ok & Protools too. I don t like the d8b monitor just in front of the windows, don't know what to do ?
Image not preserved: 344.jpg
I don t like the d8b monitor just in front of the windows, don't know what to do ?
It looks like there is enough space to put a flat screen monitor on the wall ABOVE the window? If not, then maybe you could get an A/B switch for your other monitor, so you can switch one monitor between two inputs. (Sometimes called a KVM switch, but in your case you'll only be using the "V" part of it.) It's looking great, by the way!!!! When will you be finished? - Stuart -
It looks like there is enough space to put a flat screen monitor on the wall ABOVE the window?
Yes I l lke your proposition
It's looking great, by the way!!!! When will you be finished?
Thanks Stuart, I ll remove on the 9th january. I wait for sales time for good / not too expensive lightings. Inside is nearly finished, I didnt find time to make real measurments but I will. I have to work outside now : finishing walls ( cement & painting) + an automatic gate & a parking place.