Rough Framing Is Done!!!!!
After a loooong push this weekend, we got ALL of the rough framing built, anchored, plumbed!! I did learn a valuable lesson: Don't make design changes half-way through a project without thinking about them carefully!!!!
If you look at the design on the first page, you can see a little "kickout" in the NE corner of the control room with the door a little further South. I thought it would be neat to have the door right on that little kickout instead so when you walked into the control room, you wouldn't immediately see everything. You'd have the big "reveal"
:-)
So, we went ahead and framed up the east wall of the control room and all was well. I slept on it Saturday night and was woken up with the thought that the little kickout was intended for an A/C silencer and bass hangers. While kids might have fun navigating through the bass hangers on the way into the CR (at least until they started scratching from the fiberglass), it just wasn't going to work. Unfortunately, the CR walls were already anchored into the floor. We managed to remove one of the 2x8 studs and had just enough 2x8 material left to frame a door way where I had originally put it.
Whew! I'm sooooooo sore from all the lifting and hammering (not always into the wood) but glad that we managed to get all of that lumber up without shooting a nail through any part of my body.
This week we should have all the electrical done and be ready for the first inspection by the end of the week.
:-) I'm going to probably get some of the drywall up too. I can put up the outside walls (in the little hallway between rooms) before the inspection because I won't be enclosing the other side just yet. At least it's not framing.....
Ok, here's the pictures to prove it.
len
Image not preserved: PA220001.JPG
Image not preserved: PA220002.JPG
Image not preserved: PA220003.JPG
Image not preserved: PA230004.JPG
Image not preserved: PA230005.JPG
Image not preserved: PA230006.JPG