I guess it's time to update this thread! I've been bumped to the second page
:-( At least it's because I've been busy building and not because I ran out of money or enthusiasm.
I guess the biggest item to report is
The first layer of dry wall is up EVERYWHERE!!!! :-)
We have a little mud/tape to finish on the columns. The fiberglass mesh tape does not work well (i.e., the self-adhesive backing is exactly that - it sticks to itself but nothing else!) when the temperature is low. I probably made a mistake by difering the HVAC installation (and it's $7K price tag) until I was a little closer to the end. Winter has set in here and it's common to be 20 degrees or so in the mornings and the ONLY thing that sticks in that weather is the snot running from my nose (forgive the descriptive word picture but I'm sure we've all experienced it).
I haven't got a lot of pictures. Despite my best efforts, white dry wall looks pretty much the same no matter how close or what angle you take the picture from. I do have a couple of (blurry) shots of backer rod/caulk going in that some might find informative.
Tonight's job is to finish mud and tape on the column soffits and then begin the second layer of drywall on the ceilings of the rooms we'd already finished. When (and if) the mud ever dries in the big room, we are going to go back and put up the second layer of ceiling drywall so that we'll have room for the 70 new sheets of dry wall I've got to order to finish (DAMN that estimating program!!!
:-( ). We spent a lot of time moving things around in the main room as we were trying to drywall because the pile was in the middle of the floor. I figure if we get the next layer on the ceiling (only) and leave enough space around it, we can still put up the walls while we work down the pile. We'll see.
The second layer SHOULD go up a little faster because we won't have to keep stopping and running snake cables and HVAC hoses, etc. Also, the drywall on the walls is going to go up vertically so we won't have hold up a 4x8 sheet, press it tight to the ceiling, and then try and screw it in. We WILL have to shave about 3/8" off the bottom of each sheet because we've dropped the ceiling down 1 1/4" with the two layers of DW that's up there. I should be writing another tip in
Words of Wisdom or How NOT To Do It... about this soon.
Ok, with that brief (for me) introduction, here's some pictures....
Image not preserved: PB300003.JPG
Image not preserved: PB300004.JPG
Image not preserved: PB300005.JPG
Image not preserved: PB300006.JPG
Image not preserved: PB300008.JPG
Image not preserved: PB280001.JPG