FINISHED IN 2020! Sharward's Partial Garage Conversion

Started by sharward on 3 January 2005. 1,541 replies, 2005–2020. In the Library under Build diaries. Key posts in this thread.

Originally posted at johnlsayers.com, topic 2921.

It's always the simplist things we overlook... :D :lol:
sharward wrote:
Woo-hoo -- My newest fan! :lol: Thanks for the kind words. 8)
yeaaahhh, and one of your oldest fans :lol: is still watching. everything came to a hold here because of a concert but BIG GERMAN BROTHER IS WATCHING YOU so go for it, keith...everything looks good for you right now. i hope we can ask dumb questions again as soon as we are back on track greetings from berlin jens&elis
Cool! I always wanted a big brother! ;-) Today I went to DMV to pick up my custom license plates -- I'll post pics soon -- in fact, I may make it my avatar! :twisted: I also extended the electrical circuit in the laundry room as I described earlier -- I moved the GFCI outlet down at the level fo the light switches so it's more convenient, and I put a regular outlet in its place. The ventilator will be plugged into that outlet, plus my WiFi router. Photos to come once my LAN wiring is in place and it's worth showing off. ;-) I also finally sealed all the beef! :mrgreen: I have about 1 1/2 tubes of acoustic sealant left. Can you believe it? I used 34 1/2 tubes of sealant to beef up about 25 linear feet of wall! :shock: My plan for tomorrow (technically later today): Install temporary OSB shields to protect beefed-up walls in anticipation of upcoming concrete work, and LAN wiring. --Keith :mrgreen:
Shields up! And I routed the LAN wiriting into the attic. None of it is hooked up, but at least it's totally out of the way of construction now. :) Concrete cutting is <12 hours away! :shock:
Image not preserved: westbeefdone.jpg
Image not preserved: eastbeefdone.jpg
amazing how little of the studs is left protruding. that is some serious beef man :D
OMG, I can't believe it -- just wait 'til you see what I got accomplished today! 8) I met my buddy at the equipment rental place at about 8:15 AM so pick up the concrete saw. Rather than rent a blade for $45 plus $5 per 1000th of an inch usage, I purchased a blade for $89. After an attempt to create a couple of plastic sheet dams to prevent water from getting to my belongings (an effort that mostly failed, by the way... :?), cutting commenced. My friend operated the saw -- my job was to attempt to control the water with a pushbroom. After a couple of hours, we had two very nice cuts over 3" deep! :D He then proceeded to cut the field into sections to make the subsequent break-up activity easier. At about noon we returned to the rental place. While we were there I rented an electric impact hammer! :shock: I was not very mentally prepared for this step -- I was a bit nervous at the prospect. But, it has to be done, and the worst case would have me trying it out, deciding I wasn't up for the job, and returning it within a couple of hours. Well, that didn't happen -- instead, I came home, had lunch with my wife, and then headed out to the garage to get acquainted with that little beast. I was expecting awkward, heavy, and nerveracking, but what I found was somewhat comfortable, somewhat heavy, and instant gratification! I'll be damned, I'm jackhammering my friggin' garage floor!! :mrgreen: I was pretty slow and meticulous for the first part -- the area along the cuts. I had to exercise caution so as to not chip or crack the concrete that isn't getting removed. I mostly succeeded to that end -- there are a couple of small chips along the edge (oops). I then removed the pieces and stacked them along the side yard fence. That gave me room to start breaking off larger sections along those areas. By 8 PM I was finished breaking up about half of what needs to be done! 8) My 24 hour rental is due shortly after noon tomorrow, so if I get started at about 8 AM, hopefully I'll be finished by then. IF not, no huge deal -- I'll just return it late and pay a few hours' extra. I'm really pleased with myself right now -- I'm still somewhat in disbelief that this is actually happening! :twisted: Thanks to all who continue to show an interest in this, and especially to those who have encouraged and/or inspired me along the way... I'm sure you know who you are! 8) --Keith :mrgreen:
Image not preserved: concretesawherewego.jpg
Image not preserved: concretesawgoing1.jpg
Image not preserved: concretesawgoing2.jpg
Here are pictures of the breakup!
Image not preserved: breakup04.jpg
Image not preserved: breakup06.jpg
Image not preserved: breakup08.jpg
Here you can see that with the first series of chunks out of the way, I was able to more easily break up neighboring sections. Oh, by the way, there's no wire mesh in this concrete -- which is a blessing because it makes the removal process much easier... But I'm pissed at the company that did the work -- they told me it had it! :evil: I'm very glad I didn't attempt to rely on this floor!! You'll see more picture tomorrow -- hopefully one that shows all of the concrete broken up! I'll need to research my options for getting it hauled away... :roll: --Keith :mrgreen:
Image not preserved: breakup10.jpg
Image not preserved: breakup13.jpg
Image not preserved: breakup14.jpg
Yippee!!! :mrgreen:
Image not preserved: breakupcomplete.jpg
Hi Keith, What are you replacing a concrete floor with that's going to do a better job? Here's me wishing my floor was concrete and there's you ripping yours up!! JohnG
My existing garage floor is 4" thick with no rebar and no wire mesh. The slab inside my home is 6" with rebar. Since my new walls will be extremely heavy, especially considering the fact that they'll be supporting a very heavy ceiling as well, I was not comfortable trusting the garage floor to hold all that weight without settling or breaking. I will be excavating a few inches and pouring a new slab, at least 6" thick, even deeper around the perimeter where the walls will be. I'll be using rebar so it's less likely to break. Also, I'm going to isolate the slab so that it is not in firm contact with any part of the house. They'll share earth and that's it. Read this entire thread (only 2 pages), especially Rod's comments, to see why I decided to ditch my existing floor. Seeing the quality (or lack thereof) of it now, I'm really glad I chose this route. --Keith :mrgreen:
Lookin' good Keithers; once all the old stuff is out, I'm assuming you'll rent a "thumper" to make sure compaction's adequate for the new slab? Also, when you say "thicker at the edges", you're referring to a full-fledged monolithic slab with integrated footings, right? Steve
Congratulations, Kieth!!!! When I rented my jack hammer (same as yours but red), I know it gave me great sense of power!!! :-) I had a little difficulty controlling it since it weighed more than I did it seemed that my bouncing feet were breaking more concrete than the tip of the hammer! Just like in the cartoons. Keep it going!!! I know that after I got my rough framing up I suffered a little post partition depression because right now, the cleaning up and electrical work don't seem like "progress" even though I know they are. Passing the first inspection will help I'm sure. len
knightfly wrote:
Lookin' good Keithers; once all the old stuff is out, I'm assuming you'll rent a "thumper" to make sure compaction's adequate for the new slab?
Indeed I will. I think they have electric-powered compactors for rent. I'll post some detailed prep plans in the near future... I'll be most interested in your input.
Also, when you say "thicker at the edges", you're referring to a full-fledged monolithic slab with integrated footings, right?
Correct. The floor was basically 4" thick throughout the entire area, not thicker around the walls as I was told by the company that did the work originally. :? Len, good luck with your inspection -- I'm looking forward to seeing you reach that milestone on your thread! 8) I got a couple of quotes to haul away the concrete. They range from $250 to $315. Or, for $185 I can rent an 18' x 8' x 2' container from the city, fill it up over the course of a week, and then they'll haul it away. I'll probably do the latter. --Keith :mrgreen:
Keith great progress!! :D Can’t wait to get passed all of this paper work so I too can get started. :(
Thanks vair! 8) In other news, my license plates arrived! :twisted: Fees for the special interest plate benefit the California Tahoe Conservancy. Unfortunately, the bottom part of the plate frame covers up the words "Lake Tahoe." :?
Image not preserved: progrck-small.jpg
Image not preserved: tahoeplate.jpg
Hey, ya paid yer $ to Tahoe, like the frame better anyway :D
Hey Keith, that liquid nails product you used, the LNP-903, is only available in California. Do you think the 901 stuff would work too? It's basicaly the same stuff except the 901 has a higher VOC number( not sure what that means) and a quicker dry time.
I think what I used was LNP-902. You're thinking of using LNP-901? I would think that would be OK... :roll: --Keith :mrgreen:
I think you said 903 from your previous posthttp://www.liquidnails.com/datasheets/ln903ds.pdf Oh well, whatever, I don't mean to be difficult. If you think that the 901 stuff should work than that's cool. I just don't know how big of a difference there is between the various types apart from the obvious product names.
cyeazel wrote:
Hey Keith, that liquid nails product you used, the LNP-903, is only available in California. Do you think the 901 stuff would work too? It's basicaly the same stuff except the 901 has a higher VOC number( not sure what that means) and a quicker dry time.
VOC means "Volatile (sp?) something or other" but basically its the solvants that are added to the product, be it Liquid Nails, paint, etc, that keeps the product "soft" until you use it. The VOCs evaporate and leave you with the finished product whatever it may be. Any easy way to think of it is the more VOCs there are, the more it stinks and the more ventalation you'll need to keep from frying your brain. California realizes that most of their brains are already fried so they require lower VOC products. Having been born and raised in California, I think it's ok that I can comment on my former statesmen. :-) len
Interesting. Thanks Len. I don't really smell anything when I'm around that stuff. I guess that's not a good thing though. Maybe my brain is fried already.
Great news! I had arranged for my city's solid waste department to deliver an empty container for my concrete chunks next Monday, the soonest I'd be able to get one. Just for fun, I called them yesterday (Thursday) to see if there would be a chance of getting one earlier so that I could schlep concrete over this weekend. Well, as luck had it, they had an early return, so they were able to drop it in the street in front of my house today! 8) It's 18 feet long, 8 feet wide, and about 2 feet tall. I'll post a picture tomorrow. (It was dark by the time I got home.) In other news, I've had three two-hour rehearsals with my Weekend Warriors group, and things are really coming together. A coworker dropped by during the rehearsal and he was blown away with how good we sounded under the circumstances! 8) We have one more "official" rehearsal next week, and then we'll get together once more unofficially before our live performance, scheduled for Sunday, November 13 at Hard Rock Cafe (Sacramento). It should be fun -- my first live performance! :) --Keith :mrgreen:
Hey Keith what time is the gig on th 13th?
The show runs 7 PM to about 9:30 PM. I won't know the sequence of acts until close to showtime, by which time the house will be full. I assume you're asking because you're thinking of coming by, and if so, it would be great to meet you! :) And now, back to our regularly scheduled concrete removal story... ;) My father-in-law offered to assist in the migration of all the concrete from the garage and side yard to the dumpster this morning. How could I not accept? 8) While we were working, my neighbor from across the street pitched in with his own wheelbarrow. Very cool guy! He did disclose that there was a bit of self-interest going on in that they are moving in five days and the dumpster may make things difficult as far as the moving van goes! :lol: I was very pleased by how quickly the job got done! :) All the "big" concrete was in the dumpster in less than 3 hours. Once Dad left, I began raking up the smaller chunks of concrete and crushed granite and separating them by hand. The crushed granite will be useful as a base for the new slab. (I'll need to supplement it, of course.) I'm using the large Rubbermaid-type containers to move and store the rock in the side yard. I'm about 60% done with that effort -- hopefully I'll be able to finish it up tomorrow. I'll phone in the dumpster pickup request Monday, so it will likely be hauled off on Tuesday. Look ma! No slab! :twisted: By the way, I'm the guy in the shorts. Until now I don't think I've been pictured in this thread! :roll:
Image not preserved: schlepping.jpg
Image not preserved: nomoreslab.jpg