  • binarybloke, 16 August 2010Today was day 1 of converting the groundfloor of my house extension to a single room, inside-out studio and we're having afew doubts about correct practice. My design…
  • binarybloke, 17 August 2010Day 2 of framing and it's going to get pretty tight for workspace from now on. northframe.jpg southframe.jpg @ Stuart, thanks I'll take another look at the book.
  • binarybloke, 19 August 2010Day 4 - temp fixed the wall frames after some alterations due to one of the skimmed walls being almost 30mm out of line at ceiling level. Another lesson learned - check…
  • AVare, 20 August 2010Grounding, as in the connection to the earth, is for lightning safety reasons. Having multiple grounds creates potentially multiple levels. Also these multiple levels…
  • binarybloke, 20 August 2010Day 5, temp fix ceiling frame. north_ceiling.jpg south_ceiling.jpg doorway.jpg We're considering adopting a similar mdf framing method for the fabric finish used to…
  • binarybloke, 22 August 2010Munchkin, this is the best idea we came up with. If there's an alternative I'd be interested to see it. patsudio_corners1.jpg Excuse the tiny text. Patrick
  • binarybloke, 24 August 2010Day 7 - boarding out and caulking. We're using knauf fireshield 15mm wallboards for the first layer which has made for some pretty heavy lifting once screwed to the stud…
  • binarybloke, 25 August 2010Day 8 - Doubts about rigidity disappeared today once we started screwing the walls together. We're using RWA45 insulation in the airgap and were surprised at how easy is…
  • binarybloke, 26 August 2010Day 9 - ceiling and walls secured in place :D The last 2 ceiling panels were a tight squeeze and we ended up temporarily removing a section of wall to get the necessary…
  • binarybloke, 27 August 2010Day 10 - first round of caulking complete. Now to measure, cut out and glue all the beef-up wallboards. I've included pics of how Carlo dealt with the tricky inside-out…
  • binarybloke, 3 September 2010Day 15 - Beefed up door in place and ready for seals and hardware. I may have slipped up on the 3 leaf rule here, I'm using a firedoor with 18mm and 12.5mm mdf board…
  • binarybloke, 6 September 2010Day 16 - south window fitted and more caulking. According to the "window = 1/3 mass of walls" guideline, we should be using a 10mm pane of laminate. The closest I could…
  • binarybloke, 11 September 2010Day 20 - beef-up wallboard layers completed. The walls were pretty straight forward, but the ceiling panels were a pain in the neck :D . I managed to do this working…

Page 2

  • binarybloke, 20 September 2010Day 27 - flooring and insulation all-but complete. My budget has been revised once again, but I'm starting to see light at the end of the tunnel. insulation.jpg
  • binarybloke, 28 September 2010Day 30ish - Fabric frames pretty much complete and waiting for delivery of the material from this place http://www.bradburyfabrics.com which I discovered on this forum.…
  • binarybloke, 7 October 2010Week 8 - I think. After a weekend covering the fabric frames for the ceiling, Carlo and I started first thing Monday figuring out how to approach fixing up the ceiling…
  • binarybloke, 12 October 2010I ran a quick sound level test yesterday using my analogue db meter, here's what I got: studio running @ 90db directly behind closed studio door = 65db directly behind…