Hello All:
I've decided to post my plans in the construction forum after having them in the design forum for a while now. Since I first
posted, I've been enlightened on a few topics so I'll post a link to the design thread, update you on my progress and
highlight what questions I'm still looking for answers to.
Design thread:
http://www.johnlsayers.com/phpBB2/viewtopic.php?t=8614
I have also created a PDF document in order share the design with friends and family that can be found here:
http://home.cogeco.ca/~sjager/studio.pdf You may wish to check that out for more pictures and additional details.
Where I'm At in the Process:
- I've removed the plumbing that was run below the floor joists (see pics below)
- I've moved the sheet metal duct arm that was sticking out of the big rectangular run coming out of the furnace (and protruding a foot into my proposed studio space). It is now a non-factor. (see pics below)
- I've got a home inspector friend of mine looking into how much weight my floor joists can support. Or he's looking for a contact who is capable of evaluating the situation for me. I hope to hear from him early this week
- I'm contemplating going through the town of Oakville for a building permit and routine inspections.
- I've ordered the lumber to arrive tomorrow morning and I'm anxious to start framing.
- NOTE Gullfo's comments. The angled walls in my control room will not have monitors built in. I've only angled them to avoid the sewer drains. As per Gullfo's advice I will put sound absorbing material on the them.
External image, not preserved — original: http://home.cogeco.ca/~sjager/BsmntPhoto9web.jpg
External image, not preserved — original: http://home.cogeco.ca/~sjager/BsmntPhoto7web.jpg
How to Proceed with Construction:
(see design post for details)
1. Frame walls
2. Wire Electrical (leaving space for drywall and 2x2 in between floor joists as well as any additional ducting.
3. Put up drywall in ceiling cavities. Apply caulking and support with 2x2.
4. Install Additional Ductwork and Silencer boxes
5. Install insulation, vapor barrier, and resilient channel. Finish ceiling and Finish walls with drywall.
New and Outstanding Questions:
Outstanding:
1. What is the ideal angle to splay my window glass at to keep down image reflection?
2. How much room to room sound and furnace noise attenuation have folks achieved with their “silencers” ?
3. All if all my duct is sheet metal, is extending the duct length and adding 1 more 90 degree turn going to make much
difference after the silencer is employed? What if I use insulated ducting for the feeders out of my main run (the
rectangular one)?
New Questions:
1. Will Dietrichs Resilient Channel deluxe support 3 layers of drywall or do I need to go with 2 legged RC?
2. If I tack tar paper to the back of my wall frame to stop my insulation from falling out of the wall cavities when I put my vapor barrier, being breathable, it shouldn't act as a third leaf. Does anyone see any problems with this?
3. Anyone know a Canadian vendor of backer rod? Do they have a location in southern Ontario? Home depot didn't know what I
was talking about.
Cheers,