Key posts: Basement Studio Building Thread Cologne, Germany

Substantial posts by EB1200, who started the thread, and by the forum’s most active contributors. 8 of 30 posts are listed.

Page 1

  • EB1200, 23 April 2006(moved from design forum) Hi everybody, The design is pretty much done (still talking to HVAC people), but we started framing yesterday :D I have somebody come by…
  • EB1200, 2 May 2006Yup, pu-foam, but the kind that stays flexible & is more like rubber. We used it everywhere to hold the walls in place. I'm thinking about using 15mm drywall for the…
  • EB1200, 6 May 2006Everything ran pretty smooth so far, the HVAC situation is still bugging me though. It's really hard to find a company that has any experience with HVAC for studios, and…
  • EB1200, 31 May 2006just a couple of photos to show the progress. sorry for the poor quality, my good camera is still broken.. The rest of the drywall is coming up this week, doors&windows…
  • EB1200, 1 June 2006flat ceilings, but there will be angled clouds hanging from them. i will post some sketchup shots tomorrow. @mika: yes, it's in a basement, but ceiling height is 2,8m,…
  • EB1200, 26 June 2006Just a quick update: we finished most of the drywall & framed all the beams & heating pipes. 1st fix electrics are in (i will have 1 big control panel for all lights &…

Page 2

  • knightfly, 26 June 2006My plan is to star ground all outlets to the console frame (electrician said this might be a good idea) and have one big ground run from the frame to the main ground.…
  • EB1200, 27 June 2006Thanks for the reply Steve. I was really worried about the whole grounding issue. Thing with the insulation is that the walls are build with 10cm studs, meaning i could…