Key posts: Blaisebuild - basement renovations gone wild.

Substantial posts by Johnny Corvette, who started the thread, and by the forum’s most active contributors. 16 of 24 posts are listed.

Page 1

  • Johnny Corvette, 11 February 2012What started as a simple basement re finish project has turned into a home recording studio project and more. From throwing some walls up and picking out laminate…
  • Johnny Corvette, 16 February 2012Some progress made - mostly preliminary work. Getting existing ceiling structure some additional mass and caulking the heck out of it. We should be framing up the vocal…
  • Johnny Corvette, 18 February 2012Trying to develop a decent CR layout while also fully utilizing the space. Reviewing nodes and modes but, I need to pin down a layout more before I go crazy (-er). A…
  • Johnny Corvette, 22 February 2012Photos of iso booth walls getting built. Plan is to use 3/8" lag screws to fasten walls together then caulk. Looking for something beyond caulk to place between studs on…
  • Johnny Corvette, 22 February 2012Ooooh. I guess that's true but I was actually considering NOT anchoring iso booth walls to the floor. My thinking is (was) to assemble walls together and securing top…
  • Johnny Corvette, 23 February 2012Oh darn - forgot about opening and closing the door!!! Yes a couple anchors may be prudent - don't want the booth to walk around the cement floor like some…
  • Johnny Corvette, 23 February 2012It actually did. Floors are really uneven. Will do Stuart. I used tap cons of a certain length and spacing previously based on code but, I should re look. Thanks. Some…
  • Soundman2020, 23 February 2012Do not do the RC on furring strips like that! Not even if you do it horizontally. You need at least a 4" air gap in there, or your MSM resonant frequency will be rather…
  • Johnny Corvette, 2 March 2012Thanks again for the help - of course, like everyone, I always want more. Had a couple seemingly small questions. 1) when adding mass between joists to existing ceiling…
  • Johnny Corvette, 3 March 2012Trying to get a read on how many of the WIC clips I am going to need. Rod's Home Recording Studio book seems to imply using just one every 8ft (section A-A , fig 10.9 of…
  • Johnny Corvette, 11 April 2012A few updates and photos: -Vocal Booth near complete. Finish work and cedar trim work. Door needs to be cut out for window and sweeps added but might hold off until all…
  • Johnny Corvette, 20 April 2012Photo updates - CR framing going up. Finishing up VB interior. 540331_404919172866423_100000450318549_1435243_1015604314_n.jpg…
  • Johnny Corvette, 20 April 2012In the process of reviewing electrical plans one last time. I have been opposed to cutting any holes in ceiling (2x 5/8" drywall hung from hat channel hung from whisper…
  • Johnny Corvette, 3 May 2012More photos: bracket.jpg glass.jpg first layer.jpg trap.jpg
  • Johnny Corvette, 24 September 2012Have not posted progress lately. Some additional pictures of progress so far. Control room and vocal booth mostly done. Experimenting with doors somewhat. Installed a 1…
  • Johnny Corvette, 25 October 2012They needed to use the mix room and vocal booth so those got done. mixroom.jpg