I have my floor plan for the studio posted in the other forum, and I have some questions about the SAE sites construction methods.
1) 2x16mm plasterboard. Is that 5/8" drywall?
2) double layer yellow tounge flooring. Is this yellow pine tounge/groove 3/4" plywood?
3) 50mm insulation? What type of insulation do you reccommend?
4) Floor joists, are you reccommending 2x4s on their side? and spaced on 16" centers?
5) Neoprene? Length, width and thickness? Is there a durometer (hardness) that you reccommend? What are the sizes of the pads, and what spacing do you use?
6) Windows? What type of windows are reccommended looking from the control into the main studio. Are double paned windows acceptable, what degree do you set them at?
Thanks for your help,
Josh
1) 2x16mm plasterboard. Is that 5/8" drywall?
2) double layer yellow tounge flooring. Is this yellow pine tounge/groove 3/4" plywood?
3) 50mm insulation? What type of insulation do you reccommend?
4) Floor joists, are you reccommending 2x4s on their side? and spaced on 16" centers?
5) Neoprene? Length, width and thickness? Is there a durometer (hardness) that you reccommend? What are the sizes of the pads, and what spacing do you use?
6) Windows? What type of windows are reccommended looking from the control into the main studio. Are double paned windows acceptable, what degree do you set them at?
Thanks for your help,