Can I just confirm the points I need to be careful to seal on my inside out walls? I was hoping to do the sealing when they are all up and built, as I would imagine I would have access to everywhere?
Am I right in saying I need to do where the plasterboard meets the stud at all the red lines? And also seal where the two studs meet at 90 degrees ( apply generous caulk before mechanically connecting them).
Obviously, when the plasterboard ceiling goes in, I will need to caulk that also.
Also the join between concrete floor and the bottom plate.
I am also caulking the seam between the two vertical sheets before I add the two horizontal sheets on each panel.
So just in terms of four walls up with no roof, is it just those areas or do I need to caulk them while they are on the floor for some reason?
