I'm using hi span or Smart span manufactured truss.
Can do 4.2m with 16mm plasterboard easily.
Same as in my control room. 4m spam with no extra bits!
[rename] Lilith design Phase ( L Shape )
Moderators: Aaronw, kendale, John Sayers
-
lilith_envy
- Senior Member
- Posts: 883
- Joined: Thu Jan 04, 2007 6:37 pm
- Location: Regional Victoria, Aus
- Contact:
-
John Sayers
- Site Admin
- Posts: 5462
- Joined: Mon Jan 27, 2003 12:46 pm
- Location: Australia
- Contact:
Re: [rename] Lilith design Phase ( L Shape )
javier - Deanne isn't building an inside out ceiling and its a 3.2m - 4m span.
deanne - you don't need to cut the rafters to exact shape - so long as they are held down they'll hold the plaster which will be the seal. Maybe a few multinail units would help
http://www.multinail.com.au/default.asp?id=1,3,7,119
deanne - you don't need to cut the rafters to exact shape - so long as they are held down they'll hold the plaster which will be the seal. Maybe a few multinail units would help
http://www.multinail.com.au/default.asp?id=1,3,7,119
-
xSpace
- Moderator
- Posts: 3823
- Joined: Sat Aug 25, 2007 10:54 am
- Location: Exit 4, Alabama
- Contact:
Re: [rename] Lilith design Phase ( L Shape )
Run a band of the same height material all around the outside edges of the top plate. This will close up the open ends of the joists and allow the exposed beams you want plus it will make a place for the sheet rock to be nailed into.lilith_envy wrote:This was my 1st idea as I'm thinking about have exposed beams to add a bit of character. But what happens to the right were the wall extends further.
-
John Sayers
- Site Admin
- Posts: 5462
- Joined: Mon Jan 27, 2003 12:46 pm
- Location: Australia
- Contact:
Re: [rename] Lilith design Phase ( L Shape )
yep - or do what javier is doing and build the inside out ceiling but expose the beams.xSpace wrote:Run a band of the same height material all around the outside edges of the top plate. This will close up the open ends of the joists and allow the exposed beams you want plus it will make a place for the sheet rock to be nailed into.lilith_envy wrote:This was my 1st idea as I'm thinking about have exposed beams to add a bit of character. But what happens to the right were the wall extends further.
-
lilith_envy
- Senior Member
- Posts: 883
- Joined: Thu Jan 04, 2007 6:37 pm
- Location: Regional Victoria, Aus
- Contact:
Re: [rename] Lilith design Phase ( L Shape )
Yes, thanks guys.
will see how I go with the control room ceiling and if I'm still sane at the end.
The ceiling truss is laminated and not sure if it will get the desire look.
will see how I go with the control room ceiling and if I'm still sane at the end.
The ceiling truss is laminated and not sure if it will get the desire look.