I can see alot of people that been to this thread but not too many with any comments soo far, but I will not stop and wait for that to happen.
Here is a follow up on the pics for the Absorber:
And yes, sure some will drop the comment about not using dust mask when working with hammer and mineral wool, but see my location, we are Vikings and nothing I can do about inheritated behaviours, but its so hot to work with insulation and I love the rubbing feeling when I wash after work is completed.
I was in the construction business many years ago and I could easily put up 200 to 300 m2 in a day alone but that was no cutting, just to slam in the slabs between the studs, this is quadruple work as we have to measure every slab going in thats counts for inner and outer layer. And we using OC 400mm and the insulation is standard for 600mm or for wooden studs 560mm, to save insulation I cut the 1200mm into three but there are angled studs in each end of every 1200mm absorber section (2x4 sections).
Also remember before to put in any slabs to take pictures and record the depths in each section, you will need it at the time for installing the slats.
I have a lot of this pics that I have to go through tomorrow when its time for the slats on one wall and for the insulation on the second a bit deeper than this one!!!
Am I happy





Yes indeed
C

Kaj