Gregwor wrote:I'm so excited to see how much transmission loss you've achieved with your awesome build!
Great work man!
Greg
Thanks Greg! It'll be great to see. I'm a little uneasy about the transmission loss though as I didn't have the exact right thickness of wall insulation and didn't want to compress it in, so there was a little void of about 25mm. I thought it would be fine and sealed everything up, but am having pangs of regret everytime I see the gap in between the leaves where the second door is going
I'm hoping it will be fine though
![Very Happy :D](./images/smilies/icon_biggrin.gif)
.
I'm making sure to not lose heart and get complacent with the caulking though. So we'll see.
Painting the walls today. Mist coat is dry, it's ready for the second coat now so gotta get working
Larch cladding is ordered, with a 4 to 6 week lead time
![Shocked :shock:](./images/smilies/icon_eek.gif)
.
Track lighting is ordered and arrives Tuesday.
Waiting for the electrician to get back to me with a date.
I'm waiting for a forecast of good weather over a weekend next, so I can get my doors made up and fitted.
More pics will be on their way soon enough.
Dan
Stay up at night reading books on acoustics and studio design, learn Sketchup, bang your head against a wall, redesign your studio 15 times, curse the gods of HVAC silencers and door seals .... or hire a studio designer.