I'm considering ways to mitigate this risk for my design atm. I'm coming up to internal wall framing time in my build. How do you guys plan on/usually go about sealing the ceiling modules to joist joint?Gregwor wrote:Agreed, but with a lot of attention to the sealant, this risk could be minimized. The same precision should be applied to all sealing. Specifically, the ceiling inside out modules share this same risk.The down side of building the wall in small modules, is that you have a single vertical joint seal between the modules across all three layers which is more likely to fail than overlapped joonts.
I'm weighing up a tight fit vs a 3-4mm gap all around. With a tight fit I wouldnt get such a good seal as the caulk doesn't go inbetween joist and module, but then again with a single seal, if it fails I have a larger gap for air to pass by, and reduce my spring. With a tight fit I could seal across the point they meet and then maybe put a second thin batten across and seal this too for a double seal.
So many choices...