Soundman2020 wrote:Sounds like a good plan to me. The fiber-cement board is probably about double the density of drywall or plywood, so that's great. As long as you seal it well, that will work.
You could even build out the rest of the wall to the same level with thinner fiber-cement board, laid flat on the wall, then add new siding over all of it, to get it looking neat. That would help for your isolation, too.
That's good. It helps solve the issue around the electrical area at least.
I have thought about just cladding the entire studio end of the building in a layer of siding in order to add mass, rather than working from inside. It's one of the options described in the GS thread. However, since there is no wrap or barrier on the building now, I would probably want to put Tyvek or something over the existing siding & then another layer of siding. But if I do that, sealing any air gaps between layers will be difficult because it will require sealant on both sides of the wrap (which would negate effectiveness of the wrap). So I could end up with a situation where noise gets in from the top & bottom:
In any case, I would still caulk all the stud bays and sill plates from inside -- so it will be airtight. I just don't know if the extra layer of mass on the exterior could be sealed effectively.
The patch over the electrical area technically would suffer from the same problem but on a smaller scale. I will have to see what the inside of the current patch looks like (about 2'x3' as pictured a few posts ago) once removed. It's just nailed & caulked on there.
OK beefing up: The procedure is fairly simple: you just cut panels of some type of "mass", often drywall, to fit in between the studs of your outer-leaf, caulk around the edges, then hold them in place with cleats, nailed sideways into the studs. On your GS thread I saw you are concerned about moisture, and that's a valid concern. One option would be to use Green Glue between your existing outer-leaf and your beef-up panels. That would seal them joint fully air tight so no moisture would be able to get in, thus no condensation, and would also have acoustic benefits. Of course, it ain't cheap!
But I really can't see you having a problem, assuming that your garage is built properly, with a breathable moisture barrier on the outside (eg, Tyvek), and proper attention to water flow. The caulk seals the edges of the beef-up panels in place, and the cleats keep them held up tight against the existing leaf, so I don't see much opportunity for moisture to form in between. As long as you do your vapor barrier as required by local code, you should be fine.
I have the example from Rod's book, which makes perfect sense for an interior wall. But as mentioned in the GS thread, there is no barrier on the building currently. Just a single layer of siding, nothing else (other than the insulation and drywall which I am removing). This is probably code for this area since the building was built as a detached garage, not a living space.
The green glue sounds like a possibility. I assume the idea would be to eliminate any voids between layers? I'm not 100% sure but I think if the interior is warm and the exterior is cold, there would still be condensation potentially - on the interior face of the drywall, which would be touching the insulation. A GS user from Europe suggested it was common practice there to include a layer of foil placed between siding and drywall as a moisture barrier but gave no specifics. I would assume plastic could work there as well, or even Tyvek. But I really don't know -- and it would complicate the process of sealing the edges.
In the GS thread, I referenced another thread where someone had applied the beef-up with disastrous results. His OSB mass layers got wet & disintegrated inside the wall, weakening the siding and causing it bow outwards. He had to replace it all! I PMed him for details on how he resolved this but have not heard back.
My understanding is that I "should" be OK given that I apply a suitable vapor barrier at some point -- which would be the inner leaf. I don't have the design for that worked out and it will likely be some time before that gets built. I'm just trying to prepare by getting the outer leaf ready - and the insulation replaced before winter comes.
Just to reiterate, my main concern is not with rain penetration but with vapor condensation -- something that feels a bit like black magic to me. I've read a few articles where it seems like this rarely gets done correctly, even on modern buildings. So I find it easy to overthink. Easier when I consider my outer leaf will be permanently inaccessible once finished.
I'd love find someone local to consult with about this (purely the construction aspects, not the soundproofing). But siding, roofing & HVAC guys tend to work within the tight constraints of conventional construction. I want someone who really knows what they're talking about, not a best guess, which I have no shortage of myself. I'm not sure what other tradesperson I could ask about this.