http://johnlsayers.com/phpBB2/viewtopic.php?t=567
After a long break, from a construction point of view, I finally moved my entrance to the back of the room

Barefoot suggested to create cavities near floor/wall intersections and fill them with hangers. However, due to the 3 spaces next to the control room this is not possible. See also attached floorplan.
So my main questions are:
- How important is symmetrical placement of these hangers in the room?
- Would it be sufficient to put hangers on the LH side only (floor/wall intersections).
- Any ideas on possible alternative locations to put the hangers?
- How much of them do you need for proper low end absorption?
Thanks!
Erwin