Questions on using resilient channel

Started by beanbag on 7 October 2007. 2 replies.

Originally posted at johnlsayers.com, topic 9534.

These questions should be easy, but I haven't found answers. 1: Between the panels, do you tape and mud as usual, or is something more flexible needed? 2: Bottom edge of lowest panels: I've read one set of instructions that said to have the panels rest on a layer of neoprene. The drywall contractor said something like "take a 3" wide piece of drywall and nail it to the studs. Then attach the bottom of the panel to that." I thought that would have shorted out the RC, but he said no. I might have misunderstood him. I saw a similar set of instructions here: http://www.handymanclub.com/Projects/Pr ... x?id=21788 So how do you do the bottom edge? 3: How to install RC on the top edge of the panels if you have a triangular wall, e.g. you have a wall with a sloped ceiling?
beanbag wrote:
These questions should be easy, but I haven't found answers. The drywall contractor said something like "take a 3" wide piece of drywall and nail it to the studs. Then attach the bottom of the panel to that."
What the page you read was referring to is filling the void with a 3 inch piece of rock in the "kick space" at the bottom of the framed wall in a bathroom. It isn't required in your application.