leecow, 31 October 2006Hi folks, I know it's been said many times before - what a great site and great bunch of people!! The amount of information available here is staggering. Having a…
leecow, 31 October 2006Here are a few pictures of the space and 2 spots that have me worried; the plumbing run mentioned in the first post and the stair connections. A little more detail on…
leecow, 8 November 2006We're getting close to framing and I'm thinking about symmetry on the "control room" end. Please see the picture below. Sketchup file attached in the first post if you…
leecow, 8 November 2006Sorry about the deceptive photos. Everything is boarded up right now for sheathing/shear nailing the exterior. The hideously expensive window package should arrive in…
sharward, 10 November 2006I think I see a problem with the design from an isolation perspective, assuming isolation is a priority. (I'm assuming it is, since you're doing double framing.) So,…
leecow, 10 November 2006Thanks Keith, I'll put the various 'leaf' cautions in the machine and think it through. The thought is that isolation will be provided the perimeter wall systems. The…
leecow, 16 November 2006Here's the idea for equipment isolation and continuing the isolation assemblies under the stairs and hooking up with the inner leaf in the back of the closet. This…