  • leecow, 31 October 2006Hi folks, I know it's been said many times before - what a great site and great bunch of people!! The amount of information available here is staggering. Having a…
  • leecow, 31 October 2006Here are a few pictures of the space and 2 spots that have me worried; the plumbing run mentioned in the first post and the stair connections. A little more detail on…
  • leecow, 8 November 2006We're getting close to framing and I'm thinking about symmetry on the "control room" end. Please see the picture below. Sketchup file attached in the first post if you…
  • leecow, 8 November 2006Sorry about the deceptive photos. Everything is boarded up right now for sheathing/shear nailing the exterior. The hideously expensive window package should arrive in…
  • sharward, 10 November 2006I think I see a problem with the design from an isolation perspective, assuming isolation is a priority. (I'm assuming it is, since you're doing double framing.) So,…
  • leecow, 10 November 2006Thanks Keith, I'll put the various 'leaf' cautions in the machine and think it through. The thought is that isolation will be provided the perimeter wall systems. The…
  • leecow, 16 November 2006Here's the idea for equipment isolation and continuing the isolation assemblies under the stairs and hooking up with the inner leaf in the back of the closet. This…