Johntron512 wrote:
Just one very close neighbor on the right side.
Ouch.
Only additional construction detail I have is that the replacement wall is 5/8"drywall > 2x4s and pink insulation <5/8" T111 board
That's
really inadequate -- and probably
as inadequate as the rest of the construction.
Reason for not pulling permits is to save on costs and inspections which will all decrease my budget and increase my taxes due to increased living space. If I get hassled/caught I will be forced to pay, but I feel lucky I guess. I'd only have to stop construction til I got things clear... Am I crazy?
In a word,
yes.
You're figuring that you can simply not
volunteer to pay the permit fee tax and pay the inspection fee tax and also not pay the additional property value tax, until such time that the city discovers the sin, and then the worst that would happen is that you'd have to pay those taxes then, and then be proud of yourself for postponing the payment of those taxes and maybe even save a few bucks in the interim.
That's not how it works. If they find out, they will
punish you not only by getting you to pay the fees that you didn't pay to begin with, but there's likely a
multiplier that will be applied as a
fine and then they will have the right to order you to
tear it all down because they'll be unable to determine that it was built to code.
Now I suppose it's possible for you to stay under the radar all the while... That's assuming that code enforcement is
never contacted because
all of your neighbors love you -- even the new neighbors who haven't even moved in yet -- and have zero concerns or issues about all that noisemaking going on, all the people coming and going and loading gear. Someday you'll want to sell the house. Then you'll be in the unenviable position of having to
disclose the fact that you have
unpermitted construction on the property. (I know someone who once passed on buying a house because of an unpermitted garage conversion -- that person is
me.)
Of course, I suppose it's possible that you'll live in the house until the day you die, so maybe you don't care about that. Let's talk about
hazard insurance you have on the house. Suppose there's a fire. Suppose the cause of the fire is attributed to the wiring in your unpermitted construction. The insurance adjuster will be looking for ways
not to pay all or part of the claim. Even if the fire
isn't your fault, your illegal work may be a culprit in
not retarding its spread.
The story gets worse if anyone is
injured or killed.
Yeah, I'm a worry wart. None of that is
likely to happen. (Hopefully not.)
Now, what's the
plus side of getting a permit?
- You'll sleep easier.
- Your project will be legitimate.
- The inspector(s) won't let you do crappy (unsafe) work.
- Your home will increase in value with the additional square footage and won't have an ugly disclosure come resale time.
- You'll be forced to plan everything before building, which may seem like a pain at first but you'll come to appreciate it when you actually do start building. (We'll ignore the fact that you already have started building.)
I'm sure I'm in the minority here. I've been the careful type all my life and being that way has kept me out of trouble and out of harm's way (knock on wood).
True story... Another fellow studio builder recently contacted me privately about his project. He was afraid of getting permits and planned on skipping it. I was able to change his mind by suggesting he suspend his fear and go down to the permit office to explore the situation for himself. The happy ending of the story is that he submitted his plans and got approved
that same day and was only out $25! He then thanked me for talking him into "going legit."
That, combined with the fact that I was successful in securing a permit for my project, has emboldened me to raise the question and proselytize the process more often here.
OK... I'll get off my soapbox (for a few minutes, anyway
:lol:). I hope that gives you some food for thought and that you'll reconsider your position.
Now, I'll take a stab at a few of your questions...
1. Is this within [US$5,000] budget? Maybe we aren't ready to start talking general costs yet...
I doubt it. You'll probably have to double that, at least. I'm not the best person to talk to about costs though. Plus, there may be a
Katrina effect on building materials in your part of the world. (Thank goodness that's the extent of the issue for you on that, huh?)
2. How would ventilation work?
I struggled with that for weeks/months. Then, it hit me like a ton of bricks. See my project thread where I discover
the heat recovery ventilator that I will use.
3. How would we replace the water heater if it breaks?
Your city's building department should be able to assist you in looking up code requirements for water heater closets. You will have some constraints to work with on that. That may be a major obstacle for you.
4. Are there other formations/layouts that would provide separate pros/cons?
I'm not the layout guy... But I see that John has already presented an idea. That may need to be adjusted though once you figure out all your code related constraints.
5. My budget has to also include any sound absorbers, bass traps etc, or is that unrealistic? Do the angled walls reduce/eliminate the need for some/all of that?
You'll need to spend more... Although you can home grow a lot of that stuff for a fraction of the cost of buying retail ready-made stuff. Keep studying here.
6. In considering the presentation of the studio, would a door built into the replacement wall be a good idea, thus providing a front entrance?
It may be more convenient, but your isolation will take a huge hit. (Assuming you get something more substantial going for those walls of yours -- because you've got a
lot of work ahead of you to make those walls perform even close to how you need them to.
By the way, even if that window A/C unit stays (which I suspect it won't in the end), that framing job around it is
not going to cut it.
:shock:
I hope I haven't scared you away. I really hope you stop what you're doing and come up with a safe and sound(proof) plan. We can help you do that, but you're going to have to do most of the heavy lifting.
Respectfully,
--Keith