Woohoo! The construction started today!

Started by Shaz on 22 September 2004. 72 replies, 2004–2006. In the Library under Build diaries. Key posts in this thread.

Originally posted at johnlsayers.com, topic 2372.

My studio construction has finally started today! :D
Image not preserved: 117_1734_1.JPG
Image not preserved: 117_1731_1.JPG
Image not preserved: plan1.gif
Don´t we just love pictures... keep updating!!...=)
Congratulations! Keep those pictures coming! Andre
Day 1 is always a great day. then you start working :) and looking at your progress and loving what you are doing. :) Knock it out the park shaz... :)
Thanks guys! I will be posting more pics soon. Bryan, Are you using Reliabilt steel doors from Lowes? I saw you mentioned those in another post. Are you happy with them? My contractor bought some JeldWen doors from HD, I wanted to replace those with Reliabilt.
This is what's done so far.
Image not preserved: 09282004_1.jpg
I made some 24x48 frames for 2" OC 703. These will be wrapped in fabric and mounted on the front and back walls. I don't know what to do for bass trapping yet. These frames are constructed using 1x3's, I am using 2" OC703 so it gives me about 1" air gap behind the insulation. I have Auralex Lenrds from my last studio, but with angled walls I can't use those here. They will be up for sale on eBay soon along with some MaxWall systems :D
Image not preserved: 09282004_4.jpg
Image not preserved: 09282004_5.jpg
Framing looks good so far! As far as low-freq trapping goes, check out the SAE manual and John's wall unit page, both linked by the "John Sayers productions" icon on the top left. He spells it all out.
Lookin' good. :D
I feel like a parakeet. It's looking good! Andre
Some more pictures. Here is 36"x48" CR Window opening.
Image not preserved: CR-Window-1.jpg
The insulation was also delivered today. The framing should be complete by tomorow and the electrical work should be started by tomorrow. :D
Image not preserved: Insulation-Delivery.jpg
Framing, electrical and HVAC done. Insulation started, hopefully by next week drywall will be up :D
Image not preserved: control room insulation 1.JPG
Control Room ...
Image not preserved: control room insulation 2.JPG
More ... the blue conduit is for last minute 5.1 channel speaker wires. I completely forgot this in the original plan DOH!!! Thanks to the flexible conduits, I was able to put it in my self without my contractors help and delaying the project. :D
Image not preserved: control room insulation 3.JPG
ISO/Vocals booth ...
Image not preserved: ISO1 insulation.JPG
This is the entrance to the vocals booth
Image not preserved: drywall3.jpg
this is the control room ...
Image not preserved: drywall2.jpg
inside iso/vocals booth ...
Image not preserved: drywall1.jpg
Lookin' good - how did you seal those two electrical boxes in the same cavity? Steve
Steve, one of those boxes is electrical outlet, the other one is the conduit for mic/instrument cables that goes to the control room. The two conduits run non-parallel to each other. I sealed the edges with caulk, the contractor then filled it with joint compond and drywall tape. I also put caulk on all the small holes that were inside the boxes.
Wasn't worried about parallel runs, more that both boxes are in the same stud cavity and serving separate rooms; what you did should be OK, but ideally any boxes should be in separate cavities, or at least completely mudded on the outer walls of the box with fire-preventative "putty packs" - these do a lot to deaden any sound leakage. This isn't necessary when boxes are in adjacent stud cavities and serve opposing rooms. Since you're using rigid insulation, this won't be as much of a problem as if you'd opted for standard house insulation; it's just better practice to either mummify the boxes with putty or move one to the next cavity... Steve
That's a great idea, I wish I knew about it before :( Actually come to think of it, the electrical box is run up inside the ceiling into a junction box and the other run is connected to the second outlet in the same room. What are these "putty packs" you mentioned?
Looks like they sell it in caulk (tube) form also. I found it here: http://www.bigdboltandtool.com/meta100z.html Is it that much better than acoustic caulk? I believe acoustic caulk is also fire rated isn't it?