New House, New studio, Lay out questions

Started by dcwave on 11 July 2004. 0 replies.

Originally posted at johnlsayers.com, topic 1933.

Greetings, I bought a new house last month. The prior owner got the permits, did the rough framing, electric, HVAC and plumbing, as well as having the 4 in 1 inspection for the basement. There are two rooms without drywall in the back corner of the basement that I plan on using for an ISO room and a control room. I am not sure the best way to lay the control room out. Any help on the best way to setup the control room, as well as any changes I should consider would be great. Thanks
External image, not preserved — original: http://www.dcwave.com/fp/drawing1.png