Hi all,
I have two simple drywall questions:
- I'm preparing to install isolation clips and hat channel on my ceiling. The manufacturer's instructions describe placement of clips and hat channel but nothing of the drywall itself. I've installed lots of drywall before - the edges are always screwed (or nailed) to a stud or joist. As such, neighboring sheets are held together by sharing a common stud or joist. Is this the same approach to be used with hat channel? This seems a little awkward when each hat channel is 24" apart and no closer than 6" to some walls. Consequently, those sheets must all be trimmed down to 24" + 6". Otherwise, the inside joints will be suspended in mid air (as indicated in the attached drawing), and I suspect any compound used to join the seams will eventually fall apart. [After all, the ceiling is supposed to move, right?]
- On studio walls, should I apply standard drywall joint compound and mesh tape between adjacent drywall sheets? Or, is there some special technique or material to use instead? I have plenty of sound insulation caulk but can't imagine it being necessary here. BTW, these walls will not show, so they needn't be finished all the way (and won't be painted) - I'm only applying joint compound for the purposes of sound isolation.