Gigalittle Studio Build Thread

Started by Gigalittle on 19 October 2013. 51 replies, 2013–2022. In the Library under Build diaries. Key posts in this thread.

Originally posted at johnlsayers.com, topic 18601.

Inner Leaf Framing Begins!
Image not preserved: Decoupled.jpg
Image not preserved: Framing Begins.jpg
Image not preserved: RSIC detail.jpg
Image not preserved: Decoupled Soffit 2.jpg
Image not preserved: Sway Brace.jpg
Needed to come up with a solution for fireblocking on the partition wall between the control room and live room. Since neither wall is connected to the outer framing except via the RSIC clips I added some blocking to narrow the gap. This was later caulked with fire rated filler, and mineral wool was stuffed into the gap.
Image not preserved: Fireblocking Spacers.jpg
I have decided to use mini-splits for heat and AC as I really do not want to lose any more ceiling height for additional trunk lines. Even so I had to redesign some of the framing to accommodate a system for fresh air. I also do not want to draw in cold air in the winter, and hot humid air in the summer so I used a 300 cfm ventilation fan mounted in a baffle box under the stairs to draw already conditioned air from our living room upstairs via flex duct, then feed into a master baffle box where it penetrates the outer leaf. I based the airflow calculation on needing 15 cfm per person and a potential occupancy of 5 people in both spaces, then doubled that figure to allow for static pressure loss in the baffles, and the flex duct runs.
Image not preserved: Supply Fan Box.jpg
Next built inner leaf baffles for the air supply inlets. The idea is to keep the entire space under positive pressure.
Image not preserved: Decoupled Soffit.jpg
Image not preserved: Supply Silencer.jpg
Finally added exhaust ducts with double baffles. No fans here, just a path for the air to escape and allow flow, without compromising isolation.
Image not preserved: Exhaust Silencer.jpg
Image not preserved: Exhaust Silencers 2.jpg
Image not preserved: Exhaust Silencers.jpg
From the outside all that is visible are normal exhaust vents. The air quality is greatly improved with the vent system, no more clammy feeling in the summer or stuffy C02 feeling when working in the space for an extended period - something that I had definitely noticed after completing the outer beef up and sealing.
Image not preserved: Exhaust Outer.jpg
More framing details. To clear the drain pipes and avoid more awkward soffits I decided to just lower the ceiling height in that area. This is going to give me a huge air gap for that section, which I hope will compensate somewhat for the areas with less air gap directly under the HVAC trunks.
Image not preserved: Drop Ceiling.jpg
Mid span support with RSIC Clips...
Image not preserved: Ceiling Support.jpg
Around support column. The other end of the lowered ceiling rests on the top sill of the inner leaf wall.
Image not preserved: Support Column.jpg
With the low ceiling heights I decided to go with LED recessed lighting, but to avoid creating a weak point in the inner leaf I built some "light boxes" Used 4 inch LED recessed lights from Home Depot, and built the boxes out of MDF lined with left over 5/8" drywall from the beef up to house the lights, and their junction boxes.
Image not preserved: Light Boxes 1.jpg
Image not preserved: Light Boxes 3.jpg
Image not preserved: Light Boxes Ready.jpg
that's my preferred approach - building boxes around the outlets and switches versus simply using putty pads.
Thanks Glenn! Yeah I built a bunch of little boxes for AC and low voltage wiring.
Image not preserved: Electrical Boxes.jpg
Image not preserved: Smoke Detector.jpg
Image not preserved: Light Box Up 1.jpg
Image not preserved: A Use for Putty Pads.jpg
But putty pads have their uses too...
Image not preserved: Light Box Up 2.jpg
Image not preserved: Sealing Support Column Base.jpg
I bought three 8 channel mini snakes and built some airtight MDF housings to flush mount the stage boxes.
Image not preserved: Snake Box.jpg
Image not preserved: Snake Box 1.jpg
Image not preserved: Snake Box 2.jpg
Image not preserved: Snake Box in Place.jpg
Image not preserved: Snake Box Installed.jpg
Also built hatches for the water meter and main shutoff, and the shut off for the outdoor spigot.
Image not preserved: Hatch & Cover.jpg
Image not preserved: Hatch Ready.jpg
Image not preserved: Ceiling Hatch.jpg
Pre-wiring for the Mini Split:
Image not preserved: Drop for Mini Split.jpg
$5000.00 later... Mini Splits installed
Image not preserved: Mini Split Installed.jpg
Image not preserved: Air Handler Installed.jpg
The other ends of the snakes in the control room.
Image not preserved: Contol Room Wiring.jpg
Image not preserved: Control Room Front.jpg
Live room ready for drywall...
Image not preserved: Ready For Drywall.jpg
Image not preserved: Ready For Drywall 2.jpg
might be late - did you split the audio conduit and recouple with rubber joint? to decouple between frames (if so attached).
Thanks Glenn! The PVC conduit is just there to make the opening for the snake pigtails look good. It's only about 4 inches of pipe and does not connect through to the other side.
The light boxes look great! One of the lights looks like it is in the blue electrical box surrounded by 2x4 and then some have the bigger MDF boxes. What is the difference ? And for the electrical boxes, is the 2x4 box around those just built to tightly fit the electrical box ? No safety concerns with that ? I like the idea and want to do it!
Hi Christopher, Thanks for reaching out! I made the bigger MDF boxes for the LED recessed "can" lights. They don't have cans, just a little LED module and a driver module that houses the junction box. The ceiling drywall (first layer) butts up against the MDF boxes, and the 2nd layer goes right over them. Then we cut another 4" hold in the 2nd layer drywall to install the lights. The other smaller boxes were made out of scrap 2x4s, backed with scrap MDF and sealed with caulk. They just fit around the boxes for the outlets and other wiring. The ones in the ceiling are for a surface mount light and 2 smoke detectors. No safety concerns because all the electrical is to code - all junctions are in accessible boxes no hidden splices etc. The electrician did mention it may shorten the lifespan of the LED ceiling lights a little bit due to heat build up, but if that happens they can easily be replaced. Will post some more pictures when I get a chance. Steve
if the lights are in the box enclosures, then leaving the light open to the room will help dissipate the heat (which is processed as part of the overall cooling strategy.
Gigalittle wrote:
Hi Christopher, Thanks for reaching out! I made the bigger MDF boxes for the LED recessed "can" lights. They don't have cans, just a little LED module and a driver module that houses the junction box. The ceiling drywall (first layer) butts up against the MDF boxes, and the 2nd layer goes right over them. Then we cut another 4" hold in the 2nd layer drywall to install the lights. The other smaller boxes were made out of scrap 2x4s, backed with scrap MDF and sealed with caulk. They just fit around the boxes for the outlets and other wiring. The ones in the ceiling are for a surface mount light and 2 smoke detectors. No safety concerns because all the electrical is to code - all junctions are in accessible boxes no hidden splices etc. The electrician did mention it may shorten the lifespan of the LED ceiling lights a little bit due to heat build up, but if that happens they can easily be replaced. Will post some more pictures when I get a chance. Steve
Thanks alot Steve! Great thread !! Awesome looking build, I appreciate the follow up as well. Hope all is well!
Here are some more details of the boxes as the drywall was being installed. I took care to re-caulk and make sure they were airtight as the first layer went on.
Image not preserved: Caulk the Box.jpg
Image not preserved: Caulk the Box 3.jpg
Image not preserved: Ceiling Boxes Covered.jpg
More Pics...
Image not preserved: Drywall 1.jpg
Image not preserved: Drywall in Progress.jpg
Image not preserved: Drywall 2.jpg
Image not preserved: Green Glue.jpg
Image not preserved: Control Room Drywall.jpg
Image not preserved: Protect the Snakes.jpg
Image not preserved: Drywall Done.jpg
Image not preserved: Control Room Drywall Done.jpg
Recessed Lights Installed:
Image not preserved: Recessed Lights installed.jpg
Walls Painted, LVP flooring installed..
Image not preserved: Painted.jpg
Progress in the bathroom...
Image not preserved: Installing Vanity.jpg
Image not preserved: Vanity Installed.jpg
Image not preserved: Stay on Target.jpg
Finishing touches on the water shutoff hatch...
Image not preserved: Water Shutoff.jpg
Image not preserved: Water Shutoff 3.jpg
Image not preserved: Water Shutoff 2.jpg
Image not preserved: Hatched up.jpg
Used ripstop nylon to make coverings for the gaps between the door jambs and the windows... I chose this fabric because it is non organic to avoid mold or mildew problems. In retrospect I would have got something that is already fire retardant. I found out the hard way and needed to purchase some fire retardant spray for it after the fact.
Image not preserved: Fabric for Openings.jpg
Image not preserved: Fabric 2.jpg
Image not preserved: Fabric For Windows.jpg
Image not preserved: Window in Progress.jpg
Image not preserved: Window Ready.jpg
Image not preserved: Window Ready 2.jpg
Doors finally arrived! Solidcore 1 3/4” thick prehung from Lowes. They got damaged in shipment and I got a 50% discount which will pay nicely for the modifications I plan to make to them. Going to replace all the stops with beefier material and add extra detail on the fronts to make them look like 3 panel shaker doors on the sides that are visible when shut. This will cover the damage and add some extra mass as well!
Image not preserved: Doors 3.jpg
Image not preserved: Doors 4.jpg
Image not preserved: Doors Delivered.jpg