Hello Everyone!
My name is Perry, am located in the Sacramento area of California, and am currently in the process of beginning a new project studio/rehearsal space in our area. I have been a musician for about 20 years, recording off and on throughout those years, but never seriously. Over the last couple years, I have gotten a little more serious about recording and playing and will be setting up a project studio over the next few months. If you care to read about the background of the project, go ahead and read on. If you just want to get to my point/question, skip down to the bold print!
Long story short(er), I was set to begin med school a few years ago in my late 20's after returning to and finishing up my University education. Then after a troubled pregnancy, my wife gave birth to our second child who was diagnosed with some learning disabilities and developmental difficulties. I decided (due to not being the primary household income at the time) to be a house-dad instead of pursue medicine, and be there for my family instead of studying 80 hours a week for the next 10 years. I have largely been happy with the decision to be involved in helping my children grow, but as most people who have been unemployed for long durations (chosen or otherwise), it can get might boring at times. So, to keep myself busy and as a bonus, I have gotten much more involved with music and recording, so much so that it's becoming more than just a hobby.
Now I am at the point where the kids are going off to school and I am going to be getting the time to actually get back on the job market. Rather than pursue graduate or professional school, I think I am just going to follow my passion and make a go at working as a small studio operator. I am under no disillusion that success is guaranteed, and is actually statistically unlikely. Nonetheless, I am not doing this for the income, but rather to be busy doing something I love, and hopefully (eventually) do it well enough to support itself and maybe after some time, earn some money through it. I am giving myself about 2-3 years to see if this is going to have a chance of self-sustenance. I am not looking to profit in that time, but at least would like to see growth indicating that such would be possible eventually.
So, just in case anyone else cares I will finish the background of how this poject came to be. Prior to returning to college, I was in bands and everything, toured a little, had a blast. Once I went back to school, I was focused on my education and lost touch of most of my musical friends. They all come racing back after med school didn't work out and I was home a lot with spare time. My best friend's band was renting space from a local rehearsal warehouse, where we began doing some of our recording. Treatment was terrible, it sounded bad, I had nowhere to really mix (though we added bass traps and absorption), and I kind of got me thinking that for the amount they were spending, and with the real estate market being so bad in our area, that I could probably find and lease our own space and design a much better sounding room to rehearse and record in for about the same amount of money. So, I started a company, began acquiring more gear, and have ended up doing just that - finding a space we can use to do better on our own terms. It has turned from being a simple thing among friends to quickly growing into having more people that want to record with us, so we are going to try and accommodate.
So here I am now. We have located a spot that has low rent (due to the inside of the facility being in poor appearing condition, not entirely finished walls/ceilings but structurally sound), in an area we like (5 minutes from home) right off a major freeway, that is quite a nice size, and will not pose any problems with noise complaints from neighbors. The issue is, we really don't know what we are doing as far as studio design and don't really know where to begin. Last week, I met with the property manager, brought along a measuring tape and did the best I could to get measurements of the rooms, and now I am coming to you guys with a blank slate and a lot of questions, but most importantly:
My goal here is just to get a few ideas on what YOU (the more experienced designer) might do with this space to accomplish my goals
Where I am at now.
Based on extensive reading, I believe I have a fair (not good, but fair) understanding of the principles of room construction. Design is a whole different animal. I got my education in analytic biochemistry and minored in computer engineering, so the math and physics involved are things I can grasp, but I don't know a lot about the physics/principles involved in room design, yet (I am reading as much as I can, but there are only so many hours in a day, and construction is going to being at the end of the month!)
So here I am asking for ideas, help, anything and everything of the above to help me plan out this space. Over the last two days I have tried to learn sketchup and have made a couple drawings help plan the layout and design. I guess I really need help in the practical application of a working studio, and design help.
Short term goals (6 month) due to current budget constraints:
1. Build a "live room" that can be used for band rehearsal, but primarily aimed toward recording in the long term.
2. Build a control room for said live room that is not perfect, but "good enough" just for tracking.
3. Build a mixing room for mixing/mastering that is more finished and well-treated.
4. Expand the bathroom to be a little larger, adding a comode stall and seperate urinal. (this is slightly lower on the priority list, but still up there).
Long Term Goals
1. Add a rehearsal area that is acoustically isolated enough from the 'Live Room' to allow for band rehearsals and possibly some recording
2. Add an iso booth
3. If there is room, add a lounge area with refrigerator, couch and/or chairs, perhaps a flatscreen TV and videogames, table, that sort of thing. Basically a relaxing "man cave" type area that people can use for brainstorming, writing, just generally changing the pace from the studio areas. A hangout/break room.
Budget and budgetary notes
Right now, our construction budget is very limited - around $25K U.S., with another $20-30k injection expected in Feb-Mar. So for now, we should have enough to get started. This includes wiring/cabling/electrical but does not include any HVAC (minor venting, HVAC is already installed in a good quiet way in most areas we would want it, alterations would be negligible if needed), recording gear, computers, etc. Engineering drawings for city permits will be done by a friend who is an architectural engineer, construction will be assisted by another friend who is a licensed contractor and yet another friend is a licensed electrician that will help with the electrical. So labor/design is largely free (besides the needed permits). Right now we are planning to accommodate 24 channels in the live room, with enough cabling ran to add one additional converter for a total of 30 channels. It's an "In the Box" project using a smaller amount of fairly good outboard gear, decent AD/DA, but no console is planned for now. It's not out of the question in the long-term, but we don't have a need for it now.
Additional Notes
On the drawings I am providing, ROOM 3 and ROOM 4 actually have a double (or possibly triple in some areas) leaf construction. The doorway (currently a single width door, but is framed for large double doors) is a 2-door entrance. Apparently the previous tenant was a printer and had loud machinery back there he wanted seperated from the rest of the building. The main problem with these rooms is that the roof is slightly angled but is only about 8' feet from the concrete floor at the shortest side, with a fairly flat pitch.
In Room 1, there is a drop-ceiling that is easily removable but currently at 8'. The ceiling above (and in ROOM 2) goes to about 10 feet (give or take) to the current drywall. The flooring in ROOM 1 and 2 is currently industrial (vinyl?) tile over concrete, everywhere else in the building is concrete.
The outer walls of the building are filled concrete block, with the exception of the roll-up door.
The building is in rough shape no doubt, but given we are planning heavy amounts of construction anyway, we aren't worried about that.
With that all said here is a link that has pictures of the space and a quick walkthrough video.
Folder with pictures of the space, video walkthrough and sketchup folder
In addition is a folder with some sketchup files. They are very rudimentary - I have been using sketchup for all of two days and though I am getting the hang of a lot of it, I still learning a lot. So be kind about my drawings! Obviously, the spaces outlined are square/rectangular in design and for acoustic purposes, that is not how we intend to build it, but rather was drawn that way largely to try out some general placement ideas. I really don't know where to begin, so I am hoping someone can be a hero here and point me toward some decent floorplan ideas.
For those who don't want to bother with looking at the link, here are a couple jpegs that might help you give me some pointers:
Empty building space/layout:
External image, not preserved — original: http://primeffect.com/building/26th/Empty-prelease1_measurements_front.jpg
External image, not preserved — original: http://primeffect.com/building/26th/Empty-prelease1_measurements_rear.jpg
My shoddy idea for one possible layout (as mentioned, final layout would NOT have square rooms, and this does not show treatement/desks/etc, just a rough idea for floorplan):
I removed this image because it was so quickly and terribly done that it wasn't worth wasting time looking at. I will post another in about 48 hours after I have time to put one together. Have a lot of recording going on this weekend (good problem for me to have).
I think the bathroom is in a bad spot, which will limit ideal layouts, but it can't be changed due to sewage constraints. The walls aren't ideal either, but upon further inspection, the long wall on the entry way is NOT load bearing, and can be torn down. This opens up a lot of options. The wall that runs across the room (at the bathroom) is load bearing, double leaf construction about 18" from one side to the other if i recall correctly.
So, give me some ideas! I am not looking for someone to design the place for me. Nothing of the sort, I am just asking for ideas. Feel free to make some changes to the sketchup files with your ideas, if you have the time and would be kind enough, but I would be very please with just a few lines of text here offering ideas.
Thank you so much for any thoughts!
-Perry