Hi,
i'm just about to start building my little recording/rehearsal room. my old design thread
Before I can begin to build the wooden frames, i have to do something with the floor to have a flat base for straight walls.
The highest and lowermost points of the floor in my room are 4,5cm apart (1,77inch). Most of the floor is about 1-2cm apart and one corner is 'much' deeper.
What to do?!
- Fill the whole floor with self leveling compound (~1000kg = ~ 1000eur :( )
- Fill the deep corner with self leveling compound and live with the 1-2cm level difference in the rest of the room
- Fill a 'ring' under the framed walls to have a leveled floor under them while leaving the 'inner floor' as is (5m^2 instead of 30m^2 to level)