Thanks Stuart,
yes.Hmmmm... that's a problem! It means that you are locked into those shapes and dimensions now.
I'll have to check for option 2 if I can find someone to cut it. It's about 20cm. I can't do that myself. Or just go for option 3, I don't know how much of a disadvantage this is.You have three options: 1) Use them as they are, with the CR shape not being optimal. 2) Modify them by cutting the slab in some places, and filling it in in other places. 3) Ignore them, and build any place you need to, but losing the advantage of the decoupling.
The walls are more or less separate from the floor. I'll try to explain: On each long side of the rectangular there are 5 steel beams that support the concrete ceiling. These steel beams are standing on poured blocks of concrete, about 80x80x800cm, that extend under the walls. That's about all the foundation that the walls have. On top of that is the concrete floor I checked this with a stability engineer. So the floor and walls connect at ten 80x80cm points where these concrete blocks have been poured.But first, there's a question: Did you leave a gap ONLY between the LR and CR? Or did you also leave gaps all around the edges of both slabs, such that they do not touch the walls? In other words, are your walls resting on a separate foundation from the slabs?
I believe someone told me that for a good RFZ design my ceiling height is way too small. Going for what I planned, the diamond shape, wastes space in the corners as I have read here.Flutter echo is fairly simple to deal with, using basic absorption panels at strategic locations, or diffusion in some cases. And since you will need that anyway, there's no need to splay the walls as well. The only real reason for splaying walls is if you want to build an RFZ-style studio, or one of the similar types, where the room shape itself is used to direct sound away from the mix position. Or you might just want to do it because it looks good! :)