Hi,
God I wish I had designed this Studio properly before I started building....
I am back to the drawing board and looking for advice and guidance regarding providing Fresh Air to the 3 rooms in my studio currently under construction. I have done a lot of reading about the subject on this forum and in Rod’s book and have a basic understanding of the fundamentals involved. However, I can’t seem to decide on what system will best suit my needs and budget (€1000 or under). I am considering Rod’s exchange chamber design but I run into problems here as my requirements are just to provide fresh air, no heating or cooling. I am also considering HRV system.
So really the first thing I need to do is nail down what will be the best system for my needs and then worry about the finer details...ducting size, air velocity, amount of silencers, exchange chamber room size, fan spec, etc.
Anyway here are the details of the studio...I am a complete newbie to HVAC so if I omitted any vital information please let me know
The Studio consists of Control Room and Machine Room on the 2nd level, ground floor houses the Main tracking Room and the drum room. The combined cubic volume of the studio is 4312.5 cubic ft,
CR = 1401.37 cubic ft,
Drum Room = 918 cubic ft,
Main Live Room = 1993 cubic ft.
The Size is the machine room is adjustable only by its length so at its max cubic volume it can be 402 and min approx 240 cubic ft.
I will need to provide approx 150 CFM of fresh air to the studio rooms
CR will need 45 CFM (i have a window to open if more is needed)
Drum Room will need no more than 30 CFM
Main Live Room will need a max of 75 CFM
If any more details are needed to help you to help me, just ask...
I want to use the machine room as the exchange chamber (cooler room) and provide fresh air to CR, Main tracking Room and the drum room. There are various other multimedia rooms in the studio but they will not be linked into this dedicated Fresh Air supply and extraction system. Here are some drawings of the studio
Studio - section view south
External image, not preserved — original: http://www.jamesmmedia.com/studio/cut-plane-mix-position-1.jpg
Ground Floor - floor plan
External image, not preserved — original: http://www.jamesmmedia.com/studio/grounf-floor-plan.jpg
2nd Floor - floor plan
External image, not preserved — original: http://www.jamesmmedia.com/studio/2nd-floor-plan.jpg
Whole Studio - floor plan - trace image
External image, not preserved — original: http://www.jamesmmedia.com/studio/whole-studio-trace-image.jpg
External image, not preserved — original: http://www.jamesmmedia.com/studio/aeriel-view-studio---south-east.jpg
External image, not preserved — original: http://www.jamesmmedia.com/studio/aeriel-view-studio-north-east.jpg
I hope the images can help you visualize the space....
Fresh Air Supply Plan...
With a view to implementing a variation of the exchange chamber design as outlined in both editions in Rod’s book, here is where I’m at. I think my machine room is a good candidate for the exchange chamber. I propose to run flexible insulated ducting from a vent in the eve of the West exterior wall. This will be my fresh air intake. The insulated ducting will connect to a vent in the west wall of the machine room (exchange chamber) filling this air tight space with fresh air. In the winter time when it gets cold here in Ireland I can heat the small machine room (exchange chamber) with a wall panel heater so the fresh air going to the studio rooms is not so cold. In the summer time (thought I hardly think I’ll need it) I can cool the air in the Machine Room (exchange chamber) with a small portable A/C. This slightly conditioned air will then be moved by natural convection down the main ducking. The ducking is then split at 3 different locations and the fresh air is directed to the respective rooms, CR, Main Tracking Room and Drum Room... This is the supply plan in its most basic form, I haven’t considered lots of variables like duct size, air volume and velocity, how to maintain the integrity of the soundproofing when the supply is entering the rooms, all my questions on these matters will come later.
Fresh Air intake supply floor plan
External image, not preserved — original: http://www.jamesmmedia.com/studio/supply-floor-plan.jpg
Fresh Air intake supply 3d view
External image, not preserved — original: http://www.jamesmmedia.com/studio/supply-3d.jpg
Stale Air exhaustion Plan...
All 3 of the studio rooms will have ceiling level return vents connected to ducting which will have an inline fan extracting the stale air out of the rooms. This ducting system will run out to an exhaust vent in the eve of the west exterior wall. In Rod’s design the return air seems to go back into the exchange chamber which doesn’t make any sense to me as this would just be reticulating the dirty air, am i missing something, is this necessary to pressurise the system?
Before I bombard you with a load of other questions, is the above method going to work once all the finer details are worked out?
Is installing a HRV system a better option?
Or does anyone have a better suggestion for providing fresh air to the 3 rooms while maintaining isolation?
I wish everyone a happy new year and success in all your endeavours
Warm regards
hally