Hello everyone,
I have been searching the forum for a diagram or instructions on how to properly hang the layers of drywall.
I am planning on puting up two layers of 5/8' on the ceiling and walls with green glue between.
My concern is 1)should i put up the first layer of ceiling board first and if so ,am i supose to leave a 1/4'' space at the corners where ceiling and walls meet ?
or is that only apply to the floors.
There was a diagram on here some time back i think kingfly posted it but i can't find it.
Iready to do drywall but i dont want to start then find out its done wrong.
I have 1/4'' backer rod and acoustic caulk and drywall read to go,but no clear sequence.
Thanks
How to properly hang 2 layers of sheetrock and caulk?
Originally posted at johnlsayers.com, topic 14717.
Nope you have it correct. 1/4" at walls inside and out corners and floors, caulk and then hang second layer and repeat caulk joints. Peace TomMy concern is 1)should i put up the first layer of ceiling board first and if so ,am i supose to leave a 1/4'' space at the corners where ceiling and walls meet ? or is that only apply to the floors.
Thanks Van
But i dont know if i follow you.
You saying leave 1/4'' at the edge where ceiling drywall meets wall?
Caulk , and then put up sheetrock on walls with another 1/4'' space?
So that would be two 1/4'' space facing each other wouldn't it be?
can anybody do a skethup of this ?
This is probably the diagram you saw..... Ref. Area "How to Drywall & Caulk"
Sorry, no link. Gonna make ya work for it ;)
Ok found it .
now look at the first layer of drywall #1 it looks like it is suppose to go flush up against the corner where the ceiling and wall meets.
then on the walls you leave the 1/4'' space.
Am i correct?