Hi, frequent reader first poster. I have recently gained a larger room for my live room (minus one room mate plus one big basement). I own Rod Gervais' book and I have read up quite a bit online. I think I have a pretty good plan for my ceiling, but I wanted to throw it out there for criticism and ask a couple of questions on the more arcane details. Here is what I've got:
Future live room:
External image, not preserved — original: http://c1.ac-images.myspacecdn.com/images02/31/l_31e83355a8af417abdef012a15ca18c4.jpg
Here is the ceiling to be worked:
External image, not preserved — original: http://c1.ac-images.myspacecdn.com/images02/11/l_e34822e01662449b9728c77b145de7f8.jpg
But I found a new enemy, I call him Duct the Bastard. Here is his picture, hopefully one of you has a good idea for how to battle him:
External image, not preserved — original: http://c2.ac-images.myspacecdn.com/images02/22/l_40d84ebb1a24453983e36ac900925f51.jpg
So my general plan is to follow Rod's ceiling design on page 67-70. I am going to cut drywall and put it in between the joists with backer rod and caulk along the edges. I'm thinking of green gluing two pieces between the joists. I will then insulate over that. Depending on how much transmission is going upstairs (I use a scientific method involving my drum set and my girlfriend doing homework upstairs) I may decide to put in a resilient channel on the ceiling with drywall.
I'm putting off the last step just because my ceiling is fairly low.
Here's what I don't get:
What would be the order of operations for installing the drywall, backer rod, caulk, and ledger board along the joists under the added drywall. In the book, he recommends using finishing nails to temporarily hold your drywall up. This would indicate they would eventually be removed. It appears the real weight bearing part of the job is the 1x3 ledger board underneath. At what point do you remove the nails while caulking, adding the second layer, putting in the ledger board?
Also I have some nasty pipe and air duct issues. How compromised will my plan be if I just wrap the pipe intensive sections with insulation, since I can't get drywall up around the pipes?