Hi,
I have run into a problem while trying to maintain the integrity of a 2 leaf mass air mass wall construction in the control room of my studio build…
The Problem…
Here is the wall in question
You are looking up the stairs which lead to the entrance to the Control Room
External image, not preserved — original: http://www.jamesmmedia.com/studio/looking-up-@-cavity-wall---.jpg
The wall is a 12" thick cavity concrete block wall, photo below
External image, not preserved — original: http://www.jamesmmedia.com/studio/cavity-in-block-wall---.jpg
Both leafs of the wall (4" blocks) are connected with steel wall ties inserted during construction. I have be told on this forum that this connection essentially makes the whole cavity wall one leaf. The builder who built this wall did so after a gallon of whiskey because it is vertically going inwards by about 3" towards the top( it is visually noticable)
I have studded out the exterior of the wall so its vertically correct, the arrows in the photo show the discrepancy...
The inner leaf of this wall construction is inside the control room, it is wooden studs onto which i will place layers of drywall, heres the photo
External image, not preserved — original: http://www.jamesmmedia.com/studio/cr-cavity-wall---.jpg
My Question...
If I put drywall straight onto the studs I am going to create a 3rd leaf which is not good, am i forced to plaster/ render the wall flat to the level of the studs and then put the drywall up?
Or do i have any other options that anyone can think of which would enable me to maintain the 2 leaf wall system?
here are a few more shots and as always any advise very welcome
External image, not preserved — original: http://www.jamesmmedia.com/studio/looking-up-cavity-wall-2.jpg
External image, not preserved — original: http://www.jamesmmedia.com/studio/looking-down-cavity-wall---.jpg
Regards
hally