Re: UAN - new Control Room build
Posted: Wed Jul 20, 2011 4:28 am
Pixs of recent activities ...
Getting the stack of 2" rigid in place, using 2"x2" brace With the full stack in. I added a small brace at the top of the stack to make sure it stayed put.
I needed a temporary speaker stand, so I went with a design someone [Glenn?] posted. For the time being, I set up a pair of old ALTEC studio monitors. The speakers are flush to the face of the blocks.
Not shown, but I had to add a 2x6 under the monitor to get the height at a better distance.
I'm going to be auditioning new monitors for this room. In storage I have my NS-10m and Auratones.
Have some questions to ask on electrical, HVAC, and clouds.
Getting the stack of 2" rigid in place, using 2"x2" brace With the full stack in. I added a small brace at the top of the stack to make sure it stayed put.
I needed a temporary speaker stand, so I went with a design someone [Glenn?] posted. For the time being, I set up a pair of old ALTEC studio monitors. The speakers are flush to the face of the blocks.
Not shown, but I had to add a 2x6 under the monitor to get the height at a better distance.
I'm going to be auditioning new monitors for this room. In storage I have my NS-10m and Auratones.
Have some questions to ask on electrical, HVAC, and clouds.