This "hobby room" is gonna be 11.6 X 7 metres = 81.2 sq. m.
That should be enough for a CR and a LR.
Concrete slab, double brick walls (no gap between bricks) and cement roof tiles are the main structural details of the studio. Well the 4 walls and the roof are the only things on the plans anyway
![Wink :wink:](./images/smilies/icon_wink.gif)
The walls are 3.6 m high with the highest ceiling point at 5.3 m.
So as I said, the works have started....you guess it..I've been digging, digging and...digging. The trenches 4 the footings have to be 40 cm wide and 50 deep
![Rolling Eyes :roll:](./images/smilies/icon_rolleyes.gif)
Working 10-11 hours mon-fri doesn't help much, but the money earned does a little bit. ...so I better shut up and suffer..
![Sad :(](./images/smilies/icon_sad.gif)
I am however close to completing these trenches and I hope to pour some concrete into them soon.
It was close to impossible to get any of digging machines up to where I am building (with my carport still in place) so I decided to do it by hand and save some money as well. Friends and old man are helping as much as they can so that's encouraging too
![Smile :)](./images/smilies/icon_smile.gif)
We will do most of the stuff ourselves. The things I am planning on hiring tradies for are brick laying and roof construction, eventhough I might get some good help with the roof too. I just wanna get the roof onto this thing, and then It'll be easier once I start doing the inside of it ( I hope it will anyway)...I still think the hardest part is digging the footings
![Shocked :shock:](./images/smilies/icon_eek.gif)
I will try to take some pics as we progress and post them once we've actually done something that's worth looking at...and now I'll go back to shovelling..oh no it's 10:15 at night...but yeah probably in my dreams anyway
![Laughing :lol:](./images/smilies/icon_lol.gif)
Catch yous later